All articles

How to Prepare The Viking for WinterUpdated 4 months ago

Please be aware that any issues resulting from failure to winterize your Viking properly are not covered under warranty. This includes damage to the vessel, chiller, or any other components caused by exposure to cold weather conditions.

General rule of thumb: If your nightly temperature falls below freezing, you'll need to follow the winterization guide.

Here are some key winterization steps:

Step 1: Power Down the Chiller

  • Before starting the drainage process, ensure the entire plunge system is powered down for safety.

Step 2: Drain the Viking

  • Ensure all of the water is drained from the Viking to prevent freezing and potential damage.
  • Open drainage valves or plugs to allow water to flow out.

Step 3: Remove the Inlet and Outlet Hoses

  • Disconnect the inlet and outlet hoses from the Viking unit.
  • Flush out the hoses to ensure they are clean for storing during the winter months.

Step 4: Drain the Chiller

  • Remove the blue filter housing and filter.
  • Gently tilt your chiller to allow water to flow out through the "In" and "Out" ports.
  • Optionally, use a wet vacuum to ensure all water is properly removed from the chiller.

Step 5: Carefully Store the Chiller, Viking, and Hose Accessories

  • Find a dry place to store the chiller, Viking unit, and hose accessories until you are ready to use them again.
  • Consider covering these items to keep them clean during storage.


If you have any questions or need assistance with the winterization process, feel free to contact our customer support team at [email protected]. We're here to help ensure that your cold plunge continues to provide you with the utmost satisfaction.

Was this article helpful?
Yes
No